GENERAL INFORMATION:

Activity: Project Fuel Pump System

Activity Date : November 2005

Client : PT Petrosea TBK

Location: Sanga Sanga Coal Mining Project Tenggarong East Kalimantan, Indonesia

 

 

SHARE THIS PROJECT:

Project Fuel Pump System

01. Description

Global Sinergi Utama with Professional Team has been delivery great project in Fuel Pump System project category at Sanga-Sanga East Kalimantan.

We are installing and fabricating for the fuel diesel transfer pump which is used to transfer diesel fuel from fuel storage tanks to the light vehicle and heavy duty equipment installed at the mining site that we created based on the client's request

In this project we do engineering design, product selection (main component) and get approval by client before purchasing the material and doing the installation.

Related items