01. Description
In this project we do engineering design, product selection (main component) and get approval by client before purchasing the material and do the installation on the site.
We are installing Service Water Pump which that used to transfer water to industrial zone / zone in area 72, for portable Water Pump system is used to transfer clean water to office zone and workshop. In addition we also care for the system that was built.